The works layout ensures efficient flow of steel from delivery into the stockyard through preparation, fabrication, assembly, protective treatment to dispatch.
T, I and box sections are assembled using the automatic or semi-automatic welding equipment. The web to flange submerged arc welding is carried out under semi-automatic mode. Panels assembly machines produce precise high-quality orthotropic deck panels.
The components are then shot blasted and painted to provide the required protective treatment system to meet the client's specification. These manufacturing processes are carried out using up-to-date machinery made in Finland and Germany. After application of protective treatment, the bridge components arrive to the trial erection yard. This outdoor area, served by travelling cranes with 60 metric tons lifting capacity, is used to trial erect steel structures before delivery to construction site.
The trial erection being finished, bridge steel structures are delivered to client by highway or railway transport.
16.10.2005
Voronezhstalmost is supplier of steel structures for bridge over the Daugava river in Riga more info...